Elfy said:
<balloons> :-( I'm sorry elfy <elfy> good job I'll be testing xubuntu <elfy> :) <balloons> Well, what are you still missing? <elfy> oh d'oh just realised I'll be doing arm as well ... lol
<elfy> balloons: I suspect what I am missing is the more normal term people would use :) <balloons> elfy, sure sure <balloons> basically we're going to have test-a-thons if you will every couple weeks <balloons> each time we'll pick somethng else to focus on <balloons> we'll pull the tests from the tracker and make a milestone for them and have people report on them <elfy> ok - that makes sense :) <balloons> so for next week I've got to pull the tests and make the milestone and announce i <elfy> we'll not be doing that <balloons> it's that simple <balloons> everyone will have saturday - saturday to test and report <elfy> well kind of we will - when we have something we need specifically testing then we'll be shouting <elfy> right - and then the 'other' week is not cadence testing, just normal dailies I assume
<elfy> ty balloons :) <balloons> the other week is an off week <balloons> I'll be doing things like maintaining and updating tests, playing with bugs, etc, etc <elfy> but dailies will be updated daily still? <balloons> writing new tests <balloons> yes dailies will update, and no one is stopping your from running them if you wish :-) <elfy> okey doke <balloons> our focus is just much wider than the iso's now <elfy> yea - as it perhaps should be <balloons> <3
<elfy> so it in effect gives people longer than a day to test - have the whole of a week to do so in <elfy> is that correct? <balloons> yes, exactly <balloons> flexibility <balloons> we're spread out and it's so much easier for you to plan to help out at some point in 7 days, rather than 7 hours <elfy> k - I will post that on the forum, bit of confusion I think
<balloons> I've been a bit busy <balloons> but I wanted to hop over there today <elfy> balloons: has missed this then Confused about cadence testing cycles <balloons> gotcha.. <balloons> well let's try and clear everything up then <balloons> I think it should be really understandable after our first (I hope) <elfy> I'll just post this over there :)
- elfy still doesn't understand all that cadence stuff
- cwayne (~cwayne@pool-98-118-37-160.bstnma.fios.verizon.net) has joined #ubuntu-quality
- elfy likes the idea of that with arm
- alourie_lunch has quit (Remote host closed the connection)
- balloons hasn't been to the forum
I was a bit confused too - hope this helps a bit, bear in mind when I'm talking of we I mean Xubuntu ;)
As far as I can see - it means you have a week to test in rather than a day.
I'll be testing Lubuntu here, not because I hate Unity, but I maintain over 20 PC's with P4M800 graphics that simply won't run either Compiz or Mutter in an acceptable manner :(
But I've been iso/upgrade testing since Hardy or Intrepid and I really don't get this change :confused:
When I started we'd typically have 3 or 4 days (generally about Monday thru Thursday) to test before each point-release and you could depend on the devs to fix any critical bugs, or at least set a target to have the bug fixed.
And the alphas were typically about 4 weeks apart, while the betas were closer together, and we'd generally even have an RC about a week before final. IMHO things have continued to go downhill ever since they dropped the RC.
Anyway it now sounds to me like no images will be frozen and they want testers to test each test case every day, seven days straight, every other week :eek:
Before I retired I worked in manufacturing engineering and I worked closely with the QA team to achieve ISO 9000 certification and I very strongly feel that this newest plan is an excellent example of letting the inmates run the asylum.
Or maybe Canonical wants to move all testing to "internal automated VM" which will mean even less testing on actual hardware ........... I don't know :confused:
I hope I'm wrong, maybe this will work out great ;)