Well we had a grand time at our Install Fest at Loyola college, but we can definitely do better. Let's list some things we can improve on.
*Arranging the room. Set up stations where a person can just plop down and plug in. We should have tables already setup with power and ethernet. (We need more ethernet cables :-( - We should probably buy a box of 50 in bulk)
*Networking - We need to do NAT and where we can, do wired. 5-port switches at each table with long cables running back to one large switch connect to LAN should be sufficient.
*People -
[INDENT]1 Greeter/assigner - Stands at the door and assigns incoming people to *technicians*. This position is best suited for someone who doesn't have the technical knowledge to install with confidence, but wants to help.
Technicians - I think we should pair 1 Technician with 2 or 3 installees. These technicians will stay with their assigned people the whole time. They should wait for a *bouncer* to come around if they run into trouble.
Bouncer - These people have advanced technical know-how and will walk around to each technician and assist with any problems they are having.[/INDENT]
*CDs - Heh. As everyone that was there knows, we had a few problems with media. We need more alternate CDs. People need to be refreshed on the installation requirements. CDs should be burnt in advance and tested with the "check cd for defects" option. It really slowed us down and will be unacceptable at the next one.
*Donation Box - Ohhh what about if we buy food for people? We could have the greeter tell people where food is allowed, and ask them to make a donation in a donation box set up by the food.
Overall I think it went pretty well. I'm looking forward to seeing the pictures.